---
title: Rollout Report case study
image: https://landing.groundedai.com/hubfs/Landings/Rollout%20report/00-52_rollout-report.jpg
---

[![GroundedAI logo.png](https://landing.groundedai.com/hs-fs/hubfs/groundedai-logo-copper.png?width=2048&height=2048&name=groundedai-logo-copper.png "GroundedAI logo.png")](http://www.groundedai.com)

![GroundedAI](https://landing.groundedai.com/hubfs/groundedai-logo-snow-white-1.png)

New in Strata · Rollout reports

Case study · Tunnelling

Stop using multiple software programs

# Introducing tunnel profile reports.

A rollout report is a 2D visualization of the full tunnel profile, built to the engineering standards a tunnelling project reports against. Producing a report used to mean moving a single tunnel segment through multiple software programs.

The case study compares a traditional workflow, using multiple software programs, against the GroundedAI workflow, and shows how much time is saved.

8 page PDF 6 minute read 

![Rollout report case study cover: from 14 steps to 7](https://landing.groundedai.com/hubfs/Landings/Rollout%20report/From%2014%20steps%20to%207.%20(1).png)

Takes under a minute

## Get the case study

Tell us where to send it and the PDF will be in your inbox in a couple of minutes.

What's inside

## The workflow, the time, and the GroundedAI standard.

Fewer steps

![Unrolling a tunnel scan in Strata](https://landing.groundedai.com/hubfs/Landings/Rollout%20report/00-45_first-payoff.jpg)

14 → 7

Steps

Every step of the original workflow across four software programs, and the seven steps that replaced it in Strata.

Less time

![Rollout report builder in Strata](https://landing.groundedai.com/hubfs/Landings/Rollout%20report/00-52_rollout-report.jpg)

91 → 28

Min per 10 m segment

How long one report took before compared to how long it takes in Strata.

Auto-populated information

![Rollout configuration in Strata](https://landing.groundedai.com/hubfs/Landings/Rollout%20report/00-12_unroll-panel.jpg)

Set once

Report specification

Headers, logo, springline labels and grid are set to the project specifications in Strata, then auto-populated on every report.

“

There is absolutely subjectivity to any mapping, and so to have some sort of concrete documentation that people can look at side-by-side and make a final determination of ground conditions is exactly what we need.

“

Tunnelling customer

![GroundedAI](https://landing.groundedai.com/hubfs/groundedai-logo-snow-white-1.png)

## Consolidate your underground reporting in one place.

[Get the case study →](https://landing.groundedai.com/rollout-report-case-study#enter)

**GroundedAI** | Make the underground visible

© 2026. All rights reserved.